Research and planning
|
Research and planning commenced soon after we arrived back at school to
start our A2 work. This was not long after we finished our exams. We were to
research the industries that our coursework was to be based around and also
analyse pieces of media related to what we wanted to create. For example I
would go on to analyse James Blake’s music videos because I am going to use
one of his songs for my own music video, looking at theorists and their ideas
– and more.
It also includes things such as planning my own production. Work such
as my proposal, coming up with ideas and location recces are also included.
|
Started in July – ended 28th September
|
Production - filming
|
First filming in the house – bedroom and downstairs kitchen area
|
20th September 2014 – 21st September 2014
|
Filming in Belmont downs area
|
27th September 2014
|
|
Last possible filming in house – any last bits which might need
filming
|
18th October 2014 (may not be needed)
|
|
Post production – editing
|
Edit the first version of my music video.
|
29th September – 17th October 2014
|
Edit the second version of my music video if there is one – this will
be if I’m not happy with the first attempt.
|
18th October – 31st October 2014
|
|
Research and analysis of sub-tasks, digipak album design and digipak
magazine advertisement.
|
Here I will conduct more focused research onto my subtasks and
analyse real examples and use ideas from theorists, much like I did for my
main task.
|
Some parts will be completed in the original July to 28th
September timeframe, but I will pick it up again seriously after the second
edited music video is completed. 1st November to 10th
November 2014
|
Produce sub-tasks digipak design and magazine advertisement
|
First I will create my digipak design, as the magazine advert would
not have a clear image or direction if it wasn’t able to advertise the front
cover of the digipak.
|
11th November to 15th November 2014
|
Produce magazine advert for digipak
|
16th November to 20th November 2014
|
|
Evaluate my A2 coursework
|
21st November to 17th December 2014
|
Thursday, 18 September 2014
Basic schedule for A2 Work